News Update :

Next Training BKM-PII, 25 - 28 September 2018 : PROJECT QUALITY AND COST ESTIMATION MANAGEMENT MECHANICAL EQUIPMENT AND PIPING CASE STUDY : OIL AND GAS, POWER PLANT, AND MINING (ISO/TS 29001, API Q1, AACE RP 77R)


INSTRUCTORS :
- Ir. Untung Budi.
- Muhammad Ade Irfan, IPM

.
WHAT IS THIS ?
The organization shall establish, document, implement, and maintain at all times a quality management system for all products and servicing provided for use in the industry. The organization shall measure the effectiveness and improve upon the quality management system in accordance with the requirements of code and standard, which is reflect on project specification.
The project specification establishes minimum quality management system requirements for organizations that manufacture products or provide manufacturing-related processes under a product specification for use in any industry. This specification specifies the requirements of a quality management system for an organization to demonstrate its ability to consistently provide reliable products and manufacturing-related processes that meet customer and legal requirements, with the minimum : Design and Development, Testing, Inspection, Measuring, and Monitoring Equipment.
Above specification (ISO/TS 29001, API Q1, and AACE) only the example of code and standard of one of the industry in Indonesia, but all the requirement and clause able to implement in all manufacture, vendor, and industry in the world. The putting of international standard only to description of supported of implement quality management in industry (whatever, whoever, and whenever).

.
WHAT YOU GET IT ?

To IDENTIFY AND ESTIMATION the minimum quality and cost estimation requirement based on project specification, code, and standard on mechanical equipment and piping.
To PROVIDE a framework for quality and cost estimation management related with the project specification, code, and standard.

To INCREASE familiarity with minimum quality protocol, logic, structure, costing estimation and methodology

To DESCRIBE the role and structure of the quality and cost estimation team and procedures
To APPRECIATE the application of quality and costing requirement methodology in other areas of interest

.
WHO ARE THE INSTRUCTORS ?

Ir. Untung Budi

He has 20 years’ experience in offshore/ onshore oil and gas. He has a certified on welding inspector, NDT level II, and also certified as ISO auditor.
His extensive experience includes project management as QA/QC Supervisor for project quality on EPCI Contract. He is well-versed with international codes/ standards and specifications such as API, NFPA, ASME, NACE, AWS, DNV, ANSI, ASTM, etc.
His broad client experience includes work executed for : Pertamina EP, Kangean Energy Indonesia (KEI), , BV., Chevron Pacific Indonesia (CPI), PGN, PLN, Exxon Mobil, HESS, Husky CNOOC Madura Ltd. (HCML), Premier Oil Natuna Sea, BV., TOTAL Indonesie, Pertamina Hulu Energi ONWJ, Pertamina Hulu Energi WMO,
.
Muhammad Ade Irfan, IPM
.
He has more than 20 years experience on Costing, Estimation, and Project Management. He studied on Teknik Perkapalan ITS and Magister Management UGM Jogjakarta, has experience on construction and company on with position as Estimation Manager and Package (Subcontract) Manager for onshore and offshore project. Some experience Client as follows : PT. Waskita Karya (Persero) Tbk., PT. Surveyor Indonesia (Persero), PT. Bakrie Construction, PT. Raga Perkasa Ekaguna, BP Berau Ltd., PT. Pertamina EP., Petronas Carigali (Ketapang) Ltd., CNOOC SES Ltd., PHE ONWJ., PHE WMO., HCML., DNV-GL., PT. Chandra Asri, and Evonik Sumi Asih. Expert Consultant Cost and Estimation on DNV-GL and PT. Pertamina (Persero), which scope of work FEED dan Detail Design Engineering. Certified as Insinyur Profesional Madya (IPM) from Persatuan Insinyur Indonesia (PII), Cost Estimation Professional Engineer (CCEP) from Norway Cost and Estimation Association Professional, Supply Chain Project Management (CSCPM) from British Association Supply Chain Professional, and certified as ASEAN Engineer (ASEAN Eng.) from ASEAN Federation of Engineering Organizations (AFEO).

.
WHO SHOULD ATTEND ?

The course will be of use to a wide range of disciplines whether in design, development, production, maintenance or a safety/environmental role. People in all these disciplines regularly lead, or are involved in QA/QC and Costing Estimation studies. These includes:
- Managers
- QA/QC Officer, Supervisor
- Operators / Technicians who deal with quality
- Cost Estimator
- Project Engineer
- Lead Engineer
- Senior Engineer
- Project Manager
- Cost Controller
- PPC Officer
- Finance Officer
- Scheduller
- Designer
- Proposal Officer

.
WHAT BENEFIT FOR PARTICIPANTS ?

The objective of this course are :
Participants know and having capability to identification and execute minimum quality requirement and Cost Estimation Management,
Participants know and solving case study on QA/QC and Cost Estimation Management
Participants have capability to describing and pointing QA/QC and Cost Estimation Management

.
IMPORTANT DATE AND VENUE

Training scheduled on 25 – 28 September 2018, 08.00 – 17.00 (Jakarta Time).
Training will conduct on Pomelotel Hotel, Jalan Dukuh Patra Raya No.28, Kuningan, RT.11/RW.1, Menteng Dalam, Jakarta Selatan 12870.

.
HOW TO REGISTERATION ?

Registeration for participants via Mr. Arfi Yesso, Badan Kejuruan Mesin – PII, email : bkmesin_pii@yahoo.co.id and arfi.yesso@gmail.com, phone : 021 31904667, 0813 1671 6412.

.
HOW MUCH THE INVESTMENT ?

Fee for every participant is Rp 8.000.000,- (non-member PII) or Rp 7.000.000,- (member PII), with facility soft-file and hard-file (training material), lunch, certificate, snacks.

.
AGENDA

DAY 01
Quality Management System :
1. ISO/TS 29001,
2. API Q1
3. Case Study
Management Responsibilities :
1. Organization
2. Planning
3. Supporting
4. Operational
5. Evaluation
6. Case Study

DAY 02
Testing, Inspection, Measuring, Monitoring, Analysis, and Improvement on :
1. Mechanical Equipment
2. Piping Equipment
3. Case Study

DAY 03
Cost and Estimation :
1. Design and Development Quality
2. Procurement Quality
3. Construction Quality
Case Study and Solving :
1. Mechanical Equipment
2. Piping Equipment

DAY 04
Cost to Complete Quality
Case Study and Solving


Share this Article on :